04.04.2017

Harte Gold taps Sudbury mine builder & SAMSSA Member for deposit near White River

 

 

For Full Story go to:  https://www.sudbury.com/local-news/harte-gold-taps-sudbury-mine-builder-for-deposit-near-white-river-578133

Harte Gold eyes mid-2018 mine start  

Sugar Zone

Harte Gold has hired a Sudbury mine builder to start the underground workings at its Sugar Zone gold deposit near White River. (File photo)

Harte Gold has hired a Sudbury mine builder to start the underground workings at its Sugar Zone gold deposit near White River.

Technica Mining has signed a second contract with the Toronto junior miner to extend an underground ramp and start development of stopes and vent raises in preparation for full commercial production in the second quarter of 2018.

“We would like to thank Technica Mining and their team of professionals who did an excellent job completing Harte Gold’s 70,000-tonne bulk sample with ‘zero’ lost time accidents,” said Harte Gold president-CEO Stephen Roman in a statement. “This is an outstanding achievement.”

Technica was hired in 2015 to extract a 70,000-tonne bulk sample and start construction of surface infrastructure, including collaring the portal.

The last shipment of gold ore from that bulk sample went to Barrick’s Hemlo mill on March 24.

Full Story

https://www.sudbury.com/local-news/harte-gold-taps-sudbury-mine-builder-for-deposit-near-white-river-578133